Sewage Pipe: Revision history

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2026

  • curprev 04:5004:50, 7 March 2026 2600:1700:6ed0:5180:9162:4f3:183d:2040 talk 896 bytes +32 Sewage pipe rate corrected to 10.0 waste/sec instead of the 20/s listed (this was taken from in-game experiments). The crew per pipe was then recalculated using this per second rate and the rate of sewage buildup (1 sewage per 26.5 seconds) from the wiki's crew page (only source I'm aware of). This resulted in needing 1 pipe per 265 crew instead of 1 pipe per 625 crew and so was corrected. undo Tag: Visual edit: Switched

23 June 2023

15 February 2023

14 October 2022

25 July 2022

24 July 2022