Stargate Project: Difference between revisions

JHajHa (talk | contribs)
Corrected phase 4 to show requirement for 150 Stargate Capacitors (was incorrectly listed as Stargate Actuators)
Kitirena (talk | contribs)
 
(One intermediate revision by one other user not shown)
Line 7: Line 7:


=== Phase 1: Certification ===
=== Phase 1: Certification ===
* This phase is completed during the [[Deep Space Industrialists]] contract, where the player partners with [[Alexander James Elistar]].
* [[File:Alex Elistar.png|alt=Head of AJE Industries.|thumb|Alexander James Elistar]]This phase is completed during the [[Deep Space Industrialists]] contract, where the player partners with [[Alexander James Elistar]].
* Manufacture and deliver 10 [[Stargate Frame]]s for certification.
* Manufacture and deliver 10 [[Stargate Frame]]s for certification.
* Unlocks the [[Stargate Window]] and provides '''$600,000''' in seed capital for scaling production.
* Unlocks the [[Stargate Window]] and provides '''$600,000''' in seed capital for scaling production.
Line 21: Line 21:
=== Phase 4: Crystal Refinement ===
=== Phase 4: Crystal Refinement ===
* Deliver 200 [[Stargate Receiver]], 150 Stargate Capacitor, and 250 Tilium Crystals.
* Deliver 200 [[Stargate Receiver]], 150 Stargate Capacitor, and 250 Tilium Crystals.
* Research [[Andromeda Project Part 3]] to unlock required technologies.


=== Phase 5: Power-Up ===
=== Phase 5: Power-Up ===