Stargate Project: Difference between revisions
No edit summary |
No edit summary |
||
| Line 20: | Line 20: | ||
===Phase 5=== | ===Phase 5=== | ||
* Build 5 [[Energy Transmitter]]s and install them on a ship | * Build 5 [[Energy Transmitter]]s and install them on a ship. | ||
* Use | * Use a ship capable of delivering 1,000 MW to activate the [[Stargate]]. | ||
* Maintain 100 MW continuous power to keep the gate online. | |||
===Phase 6=== | ===Phase 6=== | ||
| Line 28: | Line 29: | ||
* Research [[Zeleon Gas (Research)|Zeleon Gas]] and [[Neubidium Processing]] to unlock required refining technologies. | * Research [[Zeleon Gas (Research)|Zeleon Gas]] and [[Neubidium Processing]] to unlock required refining technologies. | ||
* Deliver 75 [[Neubidium Ingot]] and 30 [[Stable Zeleon]] to complete the phase. | * Deliver 75 [[Neubidium Ingot]] and 30 [[Stable Zeleon]] to complete the phase. | ||
* Continuous 100 MW power to the | * Continuous 100 MW power to the Stargate is required. | ||
===Phase 7=== | ===Phase 7=== | ||
| Line 36: | Line 37: | ||
* Research [[Zeleon Energy Containment]] and [[Neubidium Fabrication]] to unlock required components. | * Research [[Zeleon Energy Containment]] and [[Neubidium Fabrication]] to unlock required components. | ||
* Deliver 140 [[Zeleon Energy Cell]] and 160 [[Neubidium Capacitor]]. | * Deliver 140 [[Zeleon Energy Cell]] and 160 [[Neubidium Capacitor]]. | ||
* Continuous 100 MW power to the | * Continuous 100 MW power to the Stargate is required. | ||
* Phase 7 has no defined ending as of [[Alpha 15]]. | * Phase 7 has no defined ending as of [[Alpha 15]]. | ||